Product Details
PERMANENT TABS PACKAGE – This package includes permanent tabs for ALL references allowed to be used during the exam.
No products in the cart.
PERMANENT TABS PACKAGE – This package includes permanent tabs for ALL references allowed to be used during the exam.
$105.99
PERMANENT TABS PACKAGE – This package includes permanent tabs for ALL references allowed to be used during the exam.

Ohio, Business and Project Management for Contractors, General Contractors edition is designed to provide an overview of business management subjects for general contractor examination candidates applying for a license from the Ohio Licensing Board.

NFPA 70®, National Electrical Code® (NEC®), is the authoritative document addressing electrical installations in residential, commercial, and industrial settings. The NEC is revised every three years to stay in sync with industry practices, emerging trends, and the development and introduction of technologies to provide comprehensive rules for designers, installers, inspectors, engineers, electricians, and anyone else who works in the electrical industry. The code is organized for ease of use.

Arizona, Business and Project Management for Contractors, General Contractors edition is designed to provide an overview of business management subjects for general contractor examination candidates applying for a license from the Arizona Licensing Board.

Describes the use and inspection of basic equipment and hardware used in rigging, including slings, wire rope, chains, and attaching hardware. Explains sling angles. Describes the use of tuggers, jacks, hoists, and come-alongs.
