Nevada Carpentry and Repairs (C-3A) Online Exam Prep Tab Package Includes:
No products in the cart.

PERMANENT TABS PACKAGE – This package includes permanent tabs for all references allowed to be used during the exam.
•South Carolina, Contractor’s Guide to Business and Project Management

08401-07 Advanced Blueprint Reading (50 Hours) Explains how to derive necessary construction information from P&IDs, general arrangement drawings, ISOs, and spool sheets. Includes nine 11 x 17 blueprints. 08402-07 Advanced Pipe Fabrication (50 Hours) Covers the skills needed to layout and fabricate mitered bends, laterals, wyes, and ninety-degree intersections with tables of ordinates or by calculating ordinates with a calculator.

These preprinted tabs companion the Contractor’s Guide to Business Law and Project Management for North Carolina.

Describes the use and inspection of basic equipment and hardware used in rigging, including slings, wire rope, chains, and attaching hardware. Explains sling angles. Describes the use of tuggers, jacks, hoists, and come-alongs.
